STEEL ERECTION

Valleywise Health is a Phoenix, AZ’s only public teaching health system.  This replacement hospital will have private patient rooms, a dedicated floor for the renowned Arizona Burn Center, ten operating rooms, two interventional radiology areas, two catheterization labs, a dedicated procedural floor and a rooftop and ground level helipad.  LPR had the opportunity to provide design assist services for steel erection.  LPR worked with amfab and the construction team to establish connections, efficient details, sequences and schedule.

  • Fabricator: amfab steel inc.
  • Mobilization to completion: 5 months
  • Project is 315,000sf and 4,860 tons

Location:

Phoenix, AZ

Client:

Kitchell Contractors Inc.

Related Projects
Contact Us

We're not around right now. But you can send us an email and we'll get back to you, asap.

Not readable? Change text. captcha txt

Start typing and press Enter to search